3.2 Function<br />

Spray valve Y6<br />

Spray valve Y7<br />

Capacity [%]<br />

100<br />

0<br />

0<br />

0<br />

From the reversing osmosis system (RO system) the fully demineralized<br />

water (also called permeate) is fed to the booster pump (9) via a shut-off<br />

valve (7) and a filter (8). Depending on the current output requirements the<br />

booster pump increases the water pressure to the required operating<br />

pressure of approximately 7 bars (yield load).<br />

From the booster pump the fully demineralized water is fed to the connector<br />

box (16), either directly (on systems for exhaust air cooling) or via the silver<br />

ionization unit (12) which degerminates the water.<br />

If humidification is required, one or both spray valves (18) of the connector<br />

box are opened, depending on the current humidification requirements (if<br />

the optional third spray valve is available, the system opens one, two or all<br />

three valves at a time).<br />

The fully demineralized water is now fed to the respective spray nozzles<br />

(21) producing fine aerosol fog. The air passing by the nozzles absorbs the<br />

aerosol fog thus getting humidified. Aerosol fog not absorbed by the air is<br />

retained in the post-evaporation elements (20) thus humidifying the air<br />

passing through the post-evaporation elements. Excess water is flowing<br />

down to the bottom of the post-evaporation elements and is led to the<br />

siphon trap (19), via the drain in the water tub.<br />

Control<br />

The system is controlled by an external controller or by the PI controller built<br />

into the control unit.<br />

The standard system with a 2-valve connector box provides a 3-step<br />

control corresponding to 1/3, 2/3 and 3/3 of maximum output. The first valve<br />

opens at approximately 20% and the second one at approximately 50%.<br />

If the humidification requirements reach approximately 80% both valves<br />

are open.<br />

Note: systems equipped with the optional third valve provide 7-step control<br />

with respective humidification power.<br />

Step 1 to 3<br />

0 1 2 3<br />

1<br />

0<br />

0<br />

1<br />

1<br />

1<br />

0 20 50 80 100<br />

Control signal [%]<br />

Spray valve Y6<br />

Spray valve Y7<br />

Spray valve Y8<br />

Capacity [%]<br />

0 1<br />

Monitoring<br />

The system continuously monitors the minimum and maximum pressure,<br />

the conductance of the fully demineralized water, and the temperature of<br />

the booster pump. If the conductance of the fully demineralized water<br />

exceeds the admissible range (max. 15 µS/cm), the drain valve (14) of the<br />

connector box opens and the water system is flushed until the conductance<br />

meets the preset value. An error message is displayed if the conductance<br />

value does not reach the admissible range within a certain period.<br />

100<br />

0<br />

0<br />

0<br />

0<br />

1<br />

0<br />

0<br />

2<br />

0<br />

1<br />

0<br />

Step 1 to 7<br />

3<br />

0<br />

0<br />

1<br />

4<br />

1<br />

1<br />

0<br />

5<br />

1<br />

0<br />

1<br />

6<br />

0<br />

1<br />

1<br />

7<br />

1<br />

1<br />

1<br />

0 15 27 39 51 63 75 87 100<br />

Control signal [%]<br />

9