3.2 Function<br />
Spray valve Y6<br />
Spray valve Y7<br />
Capacity [%]<br />
100<br />
0<br />
0<br />
0<br />
From the reversing osmosis system (RO system) the fully demineralized<br />
water (also called permeate) is fed to the booster pump (9) via a shut-off<br />
valve (7) and a filter (8). Depending on the current output requirements the<br />
booster pump increases the water pressure to the required operating<br />
pressure of approximately 7 bars (yield load).<br />
From the booster pump the fully demineralized water is fed to the connector<br />
box (16), either directly (on systems for exhaust air cooling) or via the silver<br />
ionization unit (12) which degerminates the water.<br />
If humidification is required, one or both spray valves (18) of the connector<br />
box are opened, depending on the current humidification requirements (if<br />
the optional third spray valve is available, the system opens one, two or all<br />
three valves at a time).<br />
The fully demineralized water is now fed to the respective spray nozzles<br />
(21) producing fine aerosol fog. The air passing by the nozzles absorbs the<br />
aerosol fog thus getting humidified. Aerosol fog not absorbed by the air is<br />
retained in the post-evaporation elements (20) thus humidifying the air<br />
passing through the post-evaporation elements. Excess water is flowing<br />
down to the bottom of the post-evaporation elements and is led to the<br />
siphon trap (19), via the drain in the water tub.<br />
Control<br />
The system is controlled by an external controller or by the PI controller built<br />
into the control unit.<br />
The standard system with a 2-valve connector box provides a 3-step<br />
control corresponding to 1/3, 2/3 and 3/3 of maximum output. The first valve<br />
opens at approximately 20% and the second one at approximately 50%.<br />
If the humidification requirements reach approximately 80% both valves<br />
are open.<br />
Note: systems equipped with the optional third valve provide 7-step control<br />
with respective humidification power.<br />
Step 1 to 3<br />
0 1 2 3<br />
1<br />
0<br />
0<br />
1<br />
1<br />
1<br />
0 20 50 80 100<br />
Control signal [%]<br />
Spray valve Y6<br />
Spray valve Y7<br />
Spray valve Y8<br />
Capacity [%]<br />
0 1<br />
Monitoring<br />
The system continuously monitors the minimum and maximum pressure,<br />
the conductance of the fully demineralized water, and the temperature of<br />
the booster pump. If the conductance of the fully demineralized water<br />
exceeds the admissible range (max. 15 µS/cm), the drain valve (14) of the<br />
connector box opens and the water system is flushed until the conductance<br />
meets the preset value. An error message is displayed if the conductance<br />
value does not reach the admissible range within a certain period.<br />
100<br />
0<br />
0<br />
0<br />
0<br />
1<br />
0<br />
0<br />
2<br />
0<br />
1<br />
0<br />
Step 1 to 7<br />
3<br />
0<br />
0<br />
1<br />
4<br />
1<br />
1<br />
0<br />
5<br />
1<br />
0<br />
1<br />
6<br />
0<br />
1<br />
1<br />
7<br />
1<br />
1<br />
1<br />
0 15 27 39 51 63 75 87 100<br />
Control signal [%]<br />
9