Condair Dual 2 manual.pdf
Condair Dual 2 manual.pdf
Condair Dual 2 manual.pdf
- TAGS
- condair
- dual
- biossol.gr
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Install the lateral flow sheets:<br />
26<br />
ø3.3 mm<br />
26. Fix the two-part lateral flow sheets to the duct wall using the self-tapping<br />
screws provided (drill holes ø3.3 mm before). First mount the lower part<br />
of the lateral flow sheets, then the upper one (the upper part must<br />
overlap the lower one).<br />
Important! Make sure the lateral flow sheets are flush with the duct roof<br />
and the duct floor.<br />
Important! Make sure the lateral flow sheets overlap the vertical<br />
sections by a sufficient amount.<br />
Important! Make sure the lateral flow sheets are tightly screwed at<br />
every oblong hole.<br />
Finally, seal the junctions between the lateral flow sheets and the duct<br />
walls with sealing compound.<br />
33