Condair Dual 2 manual.pdf
Condair Dual 2 manual.pdf
Condair Dual 2 manual.pdf
- TAGS
- condair
- dual
- biossol.gr
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
22<br />
7<br />
7. Fix each vertical section, left and right, to the upper cross arm, using the<br />
clamping brackets, the M6x20 hexagon socket screws and the washers<br />
supplied. The two vertical sections serve as spacers when mounting<br />
the lower cross arm.<br />
Important! Before tightening the screws, push the vertical sections to<br />
the very stop towards the duct roof and align the supports parallel to<br />
the duct wall and at a right angle to the duct roof.<br />
Note: On systems with two-part vertical profiles the shorter section<br />
piece is always on top.<br />
8<br />
8. If applicable assemble the lower and middle cross arms.<br />
Important! Tighten the screws only to a point at which the wall supports<br />
can still be moved in the U-section.<br />
Note: If your system has only one cross arm proceed with step 11.