4.7 First-time commissioning<br />
44<br />
The following steps are carried out upon first-time commissioning:<br />
• Inspecting the installation<br />
• Flushing the water circuits<br />
• Checking the spray nozzles<br />
• Configuring the control unit or the system, respectively<br />
• Carrying out test runs<br />
• Setting up the ionization current and the capacity counter of the silver<br />
ionization according to the table in the appendix.<br />
Since first-time commissioning is always done by a service technician of<br />
your <strong>Condair</strong> supplier the current <strong>manual</strong> does not provide detailed information<br />
on this procedure.<br />
The commissioning protocol with the system configuration data can be<br />
found in chapter 9.4.