4.7 First-time commissioning<br />

44<br />

The following steps are carried out upon first-time commissioning:<br />

• Inspecting the installation<br />

• Flushing the water circuits<br />

• Checking the spray nozzles<br />

• Configuring the control unit or the system, respectively<br />

• Carrying out test runs<br />

• Setting up the ionization current and the capacity counter of the silver<br />

ionization according to the table in the appendix.<br />

Since first-time commissioning is always done by a service technician of<br />

your <strong>Condair</strong> supplier the current <strong>manual</strong> does not provide detailed information<br />

on this procedure.<br />

The commissioning protocol with the system configuration data can be<br />

found in chapter 9.4.