STATUS OF OIL SANDS PROJECTS (Underline denotes changes since June 1994)<br />

R&D PROJECTS (Continued)<br />

5 meters above the producer. All six wells were successfully drilled in 1990/1991. The contractual obligations for Phase B opera<br />

tions will be completed by 1994. Phase B will continue operation at least until 1996. Phase A produced over 130,000 barrels of<br />

bitumen.<br />

Phase B steaming commenced in September 1991, then was shut-in temporarily to construct larger facilities. Production was<br />

started up in early 1993. A decision regarding expansion to commercial production will be made after evaluation. Two thousand<br />

barrels per day of bitumen are currently being produced by this method. Plans are underway for expansion to over 4.000 barrels<br />

per day.<br />

OSRD states that this new method of bitumen production is a major technological breakthrough and that bitumen may eventually<br />

be produced for under C$7 per barrel, which would be less costly than most current in situ bitumen production.<br />

Project Cost: $150 million<br />

3-54<br />

SYNTHETIC FUELS REPORT, JANUARY 1995