02.03.2013 Views

Ikelic - Alliance Digital Repository

Ikelic - Alliance Digital Repository

Ikelic - Alliance Digital Repository

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

COAL<br />

lav eotl<br />

ii -<br />

l!<br />

FIGURE 1<br />

NEDOL PILOT PLANT FLOW DIAGRAM<br />

-<br />

B/togu HfM2P<br />

8hCT7 ]tUBp<br />

lr*roin-dopor tofrnt<br />

SOURCE: ISMBASM ET AL.<br />

- Catalyst<br />

- Slurry<br />

- Residence<br />

- Gas<br />

-<br />

pnhMUai furuct<br />

ft<br />

UUevs nin<br />

-Bydnfu<br />

quantity: 3 wt% (dry ash free<br />

coal basis)<br />

concentration: 40 wt% (dry coal<br />

basis)<br />

time: 60 minutes<br />

solvent ratio: 700Nm3/t<br />

H2<br />

concentration in recycle gas: 85 vol%<br />

Typical conditions for hydrogenation are as fol<br />

lows:<br />

J',<br />

^T<br />

Ijdnfca<br />

Sofral prtfcctU&g funuec<br />

AS<br />

- Pressure:<br />

- Temperature:<br />

- Catalyst:<br />

- LHSV:<br />

- Gas<br />

-<br />

T<br />

BmUbi furatet I<br />

!<br />

laidu<br />

9.8 MPa<br />

320C<br />

Ni-Mo-AI 0<br />

1 hour1<br />

slurry<br />

H2<br />

Operating Plans<br />

h>Cm<br />

Ufkt oU<br />

ratio: 5O0Nm3/t<br />

M*diuiBAMT7<br />

concentration in recycle gas: 90 voi%<br />

After mechanical completion of the pilot plant,<br />

nine test runs are planned to be carried out by<br />

1998.<br />

####<br />

THE SYNTHETIC FUELS REPORT, JANUARY 1995

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!