25.01.2014 Views

FINAL REPORT - International Joint Commission

FINAL REPORT - International Joint Commission

FINAL REPORT - International Joint Commission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Hydroelectric Power Generation Technical Work Group, White Paper – General Information on the Moses-<br />

Saunders <strong>International</strong> Power Project and the Beauharnois-Les Cedres Complex, February 2003.<br />

NYPA FERC License: http://ferris.ferc.gov/idmws/search/results.asp (doc 20031023-3050)<br />

NYPA FERC FEIS: http://ferris.ferc.gov/idmws/search/results.asp (doc 20030923-0054)<br />

Sale, M.J. and S. W. Hadley. Oak Ridge National Laboratory. Estimating Hydropower's Contribution to the<br />

Control of Greenhouse Gas Emissions.<br />

Shoreline Erosion and Sedimentation Assessment Study Downstream of the Moses-Saunders Power Dam.<br />

Executive Summary, NYPA Relicensing Study.<br />

Shoreline Erosion and Sedimentation Assessment Study. Executive Summary, NYPA Relicensing Study.<br />

St. Lawrence Peaking and Ponding. March 1, 2002 presentation to the <strong>International</strong> St. Lawrence River<br />

Board of Control.<br />

Synapse Energy Economics, Inc. (2005). Electricity Price Forecasts for St Lawrence Hydroelectric<br />

Generation. Report prepared for the Plan Formulation and Evaluation Group, February 2005.<br />

Water Level Variations in the St. Lawrence River from Moses-Saunders Power Dam to Summerstown,<br />

Ontario. Executive Summary, NYPA Relicensing Study.<br />

ANNEX 2<br />

Options for Managing Lake Ontario and St. Lawrence River Water Levels and Flows<br />

111

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!