Lake Ontario<br />

<strong>FINAL</strong> <strong>REPORT</strong><br />

Figure 13: Lake Ontario annual water levels for the 50,000-year stochastic sequence<br />

for Plan 1958-DD<br />

Figure 14: Lake Ontario annual water levels for the 50,000-year stochastic sequence for Plan A +<br />

Figure 15: Lake Ontario annual water levels for the 50,000-year stochastic sequence for Plan B +<br />

Figure 16: Lake Ontario annual water levels for the 50,000-year stochastic sequence for Plan D +<br />

44 Options for Managing Lake Ontario and St. Lawrence River Water Levels and Flows