25.01.2014 Views

FINAL REPORT - International Joint Commission

FINAL REPORT - International Joint Commission

FINAL REPORT - International Joint Commission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

St. Lawrence River at Long Sault<br />

<strong>FINAL</strong> <strong>REPORT</strong><br />

Figure 17: Long Sault annual water levels for the 50,000-year stochastic sequence<br />

for Plan 1958-DD<br />

Figure 18: Long Sault annual water levels for the 50,000-year stochastic sequence for Plan A +<br />

Figure 19: Long Sault annual water levels for the 50,000-year stochastic sequence for Plan B +<br />

Figure 20: Long Sault annual water levels for the 50,000-year stochastic sequence for Plan D +<br />

Options for Managing Lake Ontario and St. Lawrence River Water Levels and Flows<br />

45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!