ANNEX 3<br />

OntRip3: Plan Designed for Coastal Property Owners<br />

Objectives<br />

Plan OntRip3 is a plan developed specifically to minimize flood and erosion damages to shore property,<br />

while also taking into consideration the other interests in the Lake Ontario–St. Lawrence system, to try to<br />

attain a riparian-focused plan with overall net benefits. (Although OntRip3 did reduce coastal damages<br />

compared to Plan 58-DD, it did not meet the goal of doing so without increased overall losses.)<br />

Approach<br />

The OntRip3 plan is based on the benefits-balancing approach used to develop Plan D + . It considers the<br />

same major interests in the system from Lake Ontario downstream to Lac St. Pierre that are listed in the<br />

Plan D + description found in this document. The reader is directed to review that description to obtain an<br />

understanding of the methodology applied in OntRip3. OntRip3 also uses the same forecast procedures<br />

and outflow constraints as Plan D + . OntRip3 uses the same benefits scoring relationships as Plan D + , with<br />

the important exceptions of the Lake Ontario target level and the score for deviations in level from the target<br />

level. In addition, OntRip3 does not include the feature, contained in Plan D + , that occasionally shifts the<br />

Lake Ontario target level to try to induce inter-annual fluctuations in the growing season level.<br />

Benefit Score Curves<br />

With the exception of the Lake Ontario target level, OntRip3 uses the same benefit scoring relationships,<br />

or curves, as used within Plan D + . Only the relationships that differ from Plan D + are included here.<br />

The other relationships are described in the Plan D + section. The Lake Ontario target level used in OntRip3<br />

is shown in Figure B-30 along with the normal target level used in Plan D + . The OntRip3 target level is<br />

lower and has a somewhat different seasonal variation than the Plan D + target level.<br />

Level (m)<br />

Level (ft)<br />

Figure B-30: OntRip3 Lake Ontario target level and Plan D + normal target level<br />

208 Options for Managing Lake Ontario and St. Lawrence River Water Levels and Flows