25.01.2014 Views

FINAL REPORT - International Joint Commission

FINAL REPORT - International Joint Commission

FINAL REPORT - International Joint Commission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table C-8: Economic results for candidate plans by interest and region based on the extreme<br />

stochastic supply sequence S2—the century with the most severe wet Lake Ontario<br />

supply period, as well as the largest range from wet to dry supplies<br />

ANNEX 3<br />

S2 – Extremely Wet with Largest Range (Economic – Average Annual $M)<br />

Average Annual Net Benefits ($M) Plan A + Plan B + Plan D + Plan E<br />

Total $9.76 $3.97 $5.42 -$33.96<br />

COASTAL $4.31 -$1.05 $0.06 -$43.32<br />

Lake Ontario $4.40 -$0.77 $0.02 -$39.41<br />

Shore Protection Maintenance $3.20 $0.84 $0.58 -$11.85<br />

Erosion to Unprotected Developed Parcels -$0.10 -$0.10 -$0.02 -$0.27<br />

Flooding $1.30 -$1.52 -$0.53 -$27.29<br />

Upper St. Lawrence River $0.17 -$0.07 -$0.22 -$3.56<br />

Flooding $0.17 -$0.07 -$0.22 -$3.56<br />

St. Lawrence -$0.26 -$0.21 $0.25 -$0.34<br />

Flooding -$0.34 -$0.13 $0.09 -$0.40<br />

Shore Protection Maintenance $0.09 -$0.08 $0.16 $0.06<br />

COMMERCIAL NAVIGATION -$0.61 $0.73 $1.41 $5.08<br />

Lake Ontario -$0.04 -$0.01 -$0.01 -$0.02<br />

Seaway -$0.49 $0.80 $1.44 $5.11<br />

Montreal down -$0.09 -$0.06 -$0.02 $0.00<br />

HYDROPOWER $0.40 $4.39 $0.99 $12.22<br />

NYPA-OPG $1.01 $2.64 $0.28 $9.24<br />

Hydro Quebec -$0.61 $1.75 $0.71 $2.99<br />

RECREATIONAL BOATING $5.46 -$0.10 $2.76 -$7.95<br />

Above Dam $3.17 -$0.88 $0.95 -$9.64<br />

Lake Ontario $2.26 -$0.78 $0.53 -$7.48<br />

Alex Bay $0.88 -$0.15 $0.36 -$2.06<br />

Ogdensburg $0.06 $0.01 $0.04 -$0.15<br />

Lake St. Lawrence -$0.03 $0.05 $0.03 $0.05<br />

Below Dam $2.29 $0.78 $1.81 $1.69<br />

Lac St. Louis $1.17 $0.50 $0.85 $0.91<br />

Montreal $0.88 $0.27 $0.73 $0.63<br />

Lac St. Pierre $0.24 $0.01 $0.22 $0.16<br />

M&I $0.20 $0.00 $0.20 $0.00<br />

SL One-time infrastructure costs $0.00 $0.00 $0.00 $0.00<br />

LSL Water Quality Investments $0.20 $0.00 $0.20 $0.00<br />

Notes to Table C-8:<br />

1. Figures represent the average annual impact relative to Plan 1958-DD and are measured in millions of U.S. dollars.<br />

Blue indicates a positive net benefit relative to 1958-DD and red indicates a negative net benefit relative to 1958-DD.<br />

2. S1 through S4 represent four separate 101-year extreme centuries selected from the 50,000-year stochastic series,<br />

where S1 is extremely dry, S2 is extremely wet and has a large range, S3 is similar to historical and S4 has the<br />

longest drought.<br />

3. Plan E is shown for comparison purposes only to represent the natural flow condition. Plan E is not a candidate plan.<br />

Options for Managing Lake Ontario and St. Lawrence River Water Levels and Flows<br />

221

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!