ANNEX 3<br />

Figure B-16: Montreal Harbour target levels<br />

The target maximum release and target minimum release have been adjusted such that hydropower<br />

is produced most efficiently during the summer (high electricity price):<br />

Release (cms)<br />

Level (m)<br />

Figure B-17: Hydropower target releases<br />

182 Options for Managing Lake Ontario and St. Lawrence River Water Levels and Flows