12.05.2014 Views

Environmental and health related criteria for buildings - ANEC

Environmental and health related criteria for buildings - ANEC

Environmental and health related criteria for buildings - ANEC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IBO - <strong>Environmental</strong> <strong>and</strong> Health <strong>related</strong> Criteria <strong>for</strong> Buildings<br />

7.8. TQB<br />

TQB assesses the energy per<strong>for</strong>mance of a building (during operation phase) within the main<br />

category “Energy <strong>and</strong> Water” which is weighted by 20% within the overall <strong>criteria</strong> catalogue.<br />

Operational Energy<br />

The energy section within TQB is based on indicators complementing <strong>and</strong> building on each<br />

other. Possible redundancies are adjusted by the means of reduced weighting scores.<br />

The indicators assessed are the following:<br />

C1. Energy need <strong>for</strong> building operation<br />

Option 1:<br />

C1.1. Annual heating energy need (35 points)<br />

C1.2. Annual final energy need (delivered energy) (30 points)<br />

C1.3. Airtightness of the building envelope (10 points)<br />

C1.4. Free of thermal bridges (10 points)<br />

Option 2:<br />

Optional to C1.1.-C1.4.: If the building is certifiable in accordance with the guidelines<br />

of the Passive House Institute Darmstadt, the highest score <strong>for</strong> C1.1. to C1.4. can be<br />

achieved by showing compliance with the requirements of PHPP (Passive House<br />

Planning (Design) Package) 40 .<br />

C2. Primary Energy / CO 2 -Emissions (building operation)<br />

C2.1. Annual Primary Energy Requirement (non-renewable) (65 points) or optional<br />

C2.1a Use of renewable energy sources <strong>for</strong> space heating (25 points)<br />

C2.1b Domestic hot water (solar collectors/heat pumps, insulation of buffer<br />

store, warm water connection <strong>for</strong> washing machines/dish washers) (20 points)<br />

C2.1c Photovoltaic (10 points)<br />

C2.1d Energy-efficient mechanical ventilation system (5 points)<br />

C2.1e Energy-efficient lighting (5 points)<br />

C2.2. CO 2 -Emissions (building operation) (20 points)<br />

Besides the main indicators, heating energy dem<strong>and</strong> <strong>and</strong> final energy dem<strong>and</strong> including the<br />

losses of transmission, ventilation, solar <strong>and</strong> internal gains <strong>and</strong> losses/gains of the building<br />

services, special attention is paid to thermal bridges <strong>and</strong> airtightness.<br />

Rating starts with fulfilment of the actual Building Regulation requirements (2010 level). The<br />

highest level is defined by 10 kWh/m² conditioned gross floor area a heating energy need referring to the<br />

national calculation methodology (OIB-Guideline 6 41 ). Final energy need 42 shall undercut the<br />

40 http://www.passivhaustagung.de/Passive_House_E/PHPP.html<br />

41 OIB Richtlinie 6: Energieeinsparung und Wärmeschutz (Hg.v. Österreichischen Institut für Bautechnik, Wien,<br />

April 2007) www.oib.or.at<br />

Leitfaden Energietechnisches Verhalten von Gebäuden (Hg.v. Österreichischen Institut für Bautechnik, Wien,<br />

April 2007)<br />

Erläuternde Bemerkungen zu OIB-Richtlinie 6: „Energieeinsparung und Wärmeschutz“ und zum OIB-Leitfaden<br />

„Energietechnisches Verhalten von Gebäuden“ (Hg. v. Österreichischen Institut für Bautechnik, Wien, April 2007)<br />

42 Final energy need or delivered energy is calculated in correspondence with ON H 5055 - ON H 5059.<br />

Final Report 74 31 03 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!