Specific terms:<br />

<strong>Activities</strong>:<br />

• Actual schedule and completion of the activities compared to the initial plan<br />

and covenant with donor’s policy and guidelines.<br />

• How can delays in the activities be avoided and possible time-savings aspects be<br />

developed<br />

• Identification of the main strengthens of the institution regarding the activity delays<br />

and external factors.<br />

• What are the reasons for the deviation of the planned activities and what improvements<br />

can be made for future interventions<br />

• What are the effects of the above-mentioned deviations<br />

• How can we improve the performance of remote control activities<br />

• Cost / Benefits analysis of the activities.<br />

• How have the beneficiaries accepted the project activities<br />

Results:<br />

• Have the activities given results and/or provided services in the communities<br />

• Identify the main deviations between expected results and the achievements<br />

and lessons learned. Identify the reasons and make recommendations for future<br />

interventions.<br />

• What institutional structure and capacity building efforts are required for future<br />

interventions (considering the post-crisis phase) in the project area<br />

• Measure the cost/efficiency of the activities (cost in terms of monetary and<br />

human resource values).<br />

Project Purpose:<br />

• Indicate the achievement of sustainable benefits for the target group.<br />

• Analyze if the project has achieved its purpose.<br />

• Are the services provided by the project sustainable Will they continue to be<br />

provided to the target group once external assistance has been completed<br />

• Is the performance (positive or negative) due to the initial problem analysis, the<br />

project design, or implementation<br />

• Was the financial viability of the project adequately appraised<br />

• Were the main objectives of the project adapted to the context, according the<br />

accessibility and the main axis of the ACF Strategy in the mission<br />

232<br />

INCOME GENERATING ACTIVITIES: A KEY CONCEPT IN SUSTAINABLE FOOD SECURTIY