D32<br />

© Schneider Electric - all rights reserved<br />

D - MV & LV architecture selection guide<br />

12 Example: <strong>electrical</strong> <strong>installation</strong><br />

in a printworks<br />

12.4 Architecture assessment criteria<br />

Criteria Category<br />

On-site work time Secondary<br />

Environmental impact Minimal: compliance with European standard regulations<br />

Preventive maintenance costs Standard<br />

Power supply availability Level I<br />

Step 1: Architecture fundamentals<br />

Choice Main criteria Solution<br />

Connection to upstream<br />

network<br />

Schneider Electric - Electrical <strong>installation</strong> guide 2008<br />

Isolated site single branch circuit<br />

MV Circuits Layout + criticality single feeder<br />

Number <strong>of</strong> transformers Power > 2500kVA 2 x 2000kVA<br />

Number and distribution <strong>of</strong><br />

substations<br />

Surface area and power<br />

distribution<br />

MV Generator Site activity No<br />

MV<br />

LV<br />

MV<br />

LV<br />

2 possible solutions: 1<br />

substation or 2 substations<br />

b if 1 substations: NO link<br />

between MLVS<br />

b if 2 substations:<br />

interconnected switchboards<br />

MLVS 1 MLVS 2 MLVS 1 MLVS 2<br />

Fig. D29 : Two possible single-line diagrams<br />

MV<br />

LV<br />

Trunking<br />

MV<br />

LV