G46<br />

© Schneider Electric - all rights reserved<br />

G - Sizing and protection <strong>of</strong> conductors<br />

Q9<br />

C9<br />

L9<br />

B8<br />

x1<br />

Fig. G65 : Example <strong>of</strong> single-line diagram<br />

Q6<br />

C6<br />

T6<br />

Q7<br />

C7<br />

B2<br />

Circuit 9<br />

T1<br />

C1<br />

Q1<br />

Circuit 6<br />

P = 400 kVA<br />

U = 400 V<br />

Circuit 7<br />

ku = 1.0<br />

ib = 250.00 A<br />

P = 147.22 kW<br />

8 Worked example <strong>of</strong> cable<br />

calculation<br />

Worked example <strong>of</strong> cable calculation (see Fig. G65)<br />

The <strong>installation</strong> is supplied through a 1,000 kVA transformer. The process requires<br />

a high degree <strong>of</strong> supply continuity and this is provided by the <strong>installation</strong> <strong>of</strong> a 500 kVA<br />

400 V standby generator and the adoption <strong>of</strong> a 3-phase 3-wire IT system at the main<br />

general distribution board. The remainder <strong>of</strong> the <strong>installation</strong> is isolated by a 400 kVA<br />

400/400 V transformer. The downstream network is a TT-earthed 3-phase 4-wire<br />

system. Following the single-line diagram shown in Figure G65 below, a reproduction<br />

<strong>of</strong> the results <strong>of</strong> a computer study for the circuit C1, the circuit-breaker Q1, the circuit<br />

C6 and the circuit-breaker Q6. These studies were carried out with ECODIAL 3.3<br />

s<strong>of</strong>tware (a Merlin Gerin product).<br />

This is followed by the same calculations carried out by the method described in this<br />

guide.<br />

1000 kVA 400 V 50 Hz<br />

Circuit 1<br />

Q10<br />

C10<br />

L10<br />

Q3<br />

B4<br />

x1<br />

Switchboard 2<br />

Ks = 1.00<br />

ib = 826.8 A<br />

Q12<br />

C12<br />

L12<br />

Circuit 10<br />

ku = 1.0<br />

ib = 160.00 A<br />

P = 94.22 kW<br />

x1<br />

Schneider Electric - Electrical <strong>installation</strong> guide 2008<br />

G5<br />

C5<br />

Q5<br />

Circuit 12<br />

G<br />

ku = 1.0<br />

ib = 250.00 A<br />

P = 147.22 kW<br />

Q11<br />

C11<br />

L11<br />

x1<br />

P = 500 kVA<br />

U = 400 V<br />

Circuit 5<br />

Switchboard 8<br />

Ks = 1.00<br />

ib = 490.0 A<br />

Circuit 11<br />

Switchboard 4<br />

Ks = 1.00<br />

ib = 250.0 A<br />

ku = 1.0<br />

ib = 80.00 A<br />

P = 47.11 kW