29.06.2015 Views

Expert Documentation

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 5 <br />

Remark:<br />

The base station must be installed with the LED at the top.<br />

Attaching a 4070 IO Base Station Directly on the Wall<br />

Locate the position of the drill holes on the wall (distance between the two holes: 55.2 +/- 2<br />

mm), then drill the holes and insert the dowels. Tighten the screws leaving sufficient space<br />

between the screw head and the wall. Position the base station slots at the same height as the<br />

screw heads (in ) then move the station down to lock it in position .<br />

5-32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!