12.07.2015 Views

SFO Template - Office of Construction & Facilities Management Home

SFO Template - Office of Construction & Facilities Management Home

SFO Template - Office of Construction & Facilities Management Home

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MAY 2009SOLICITATION FOR OFFERS OUTPATIENT CLINIC <strong>SFO</strong> NO. VA-101-XX-RP-XXXX[INSERT LOCATION OF FACILITY]6.6 PLUMBING6.6.1 GENERALThe Lessor and the Lessor’s Design Engineer (henceforth known as the A/E or Engineer) shalluse the contents <strong>of</strong> this document to design, install, test, adjust, balance, and commission thePlumbing systems in a trouble-free working manner to provide comfort and safety to theveterans, staff, and visitors.6.6.2 MANDATORY PROVISIONSSee Paragraphs 4.1 CODES and 4.2.1 VA ADOPTED CODES, STANDARDS, ANDEXECUTIVE ORDERS.6.6.3 APPLICABLE CODES AND CRITERIASee Paragraph 4.1 CODES, for applicable codes and standards.6.6.4 PLUMBING DESIGN SCOPEThe plumbing design scope includes the following systems, which are detailed following thislist.A. Water Distribution SystemB. //Potable Water Treatment Systems (includes s<strong>of</strong>tening, reverse osmosis, de-alkalizing,deionization, and reagent grade water production)//C. Domestic Hot Water System, including RecirculationD. //Steam System//E. Sewer/Vent/Waste System inside buildingsF. Ro<strong>of</strong> Drainage SystemG. //Sub Soil Drainage System//H. //Interior Fuel Gas System//I. //Medical Gas and Vacuum System//J. //Dental Gas and Oral Evacuation System//K. //Laboratory/Shop Compressed Air System//L. //Acid Waste and Vent System//M. Seismic Restraint SystemN. Legionella MitigationA. Water Distribution SystemSize the piping for the hot and cold water systems per criteria specified in the IPC includingbackflow preventers, water hammer arrestors, and trap primers. Minimum pipe size shall be¾".Provide wall hydrants (a maximum <strong>of</strong> 200 feet [60.96 m] apart at the building exteriorperimeter) at loading docks and at building entrances, with a minimum <strong>of</strong> one wall hydrant oneach exterior wall.Maintain a minimum pressure <strong>of</strong> 35 PSI [240 kPa] at the plumbing fixtures on the top floor. Inminimum pressure calculations, use residual pressure at design flow. Monitor for diurnalpressure fluctuations experienced by the building water supply and modify starting pressuresaccordingly. Provide a pressure gauge on the top floor branch adjacent to the riser.Part I: Basic Solicitation Requirements – Page 114 <strong>of</strong> 196Lessor __________ Gov’t. ____________________ <strong>of</strong> __________ Pages

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!