12.07.2015 Views

SFO Template - Office of Construction & Facilities Management Home

SFO Template - Office of Construction & Facilities Management Home

SFO Template - Office of Construction & Facilities Management Home

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MAY 2009SOLICITATION FOR OFFERS OUTPATIENT CLINIC <strong>SFO</strong> NO. VA-101-XX-RP-XXXX[INSERT LOCATION OF FACILITY]Heating, ventilating, and air-conditioning (HVAC) systems.Heating and Cooling Equipment for Operating Suites, Recovery, and EmergencyTreatment Spaces.oHVAC equipment for Magnetic Resonance Imaging (MRI) Suites andComputerized Topographic (CT) Scanners.o HVAC equipment for Main Computer Room, Telephone Equipment Room,Telephone Console Room, Head End Room, and TelecommunicationsRooms.Ventilation, cooling and control equipment for elevator machine rooms, where theelevator(s) is backed by generator power.Hot Water Generator: Equipment, controls, and light fixture and receptacle near thegenerator.Refrigerated Medical Storage: Refrigeration equipment.Sewage Pumps: Equipment, controls, and light fixture and receptacle near thepumps.Supply, Processing, and Distribution (SPD):oooTask illumination and selected receptacles in the following areas: core, sterilestorage, non-sterile storage, preparation, and decontamination.One ultrasonic cleaner, one ethylene oxide gas sterilizer, one steam sterilizer,one washer sterilizer, and one gas generator.Equipment needed to preserve subsistence drugs that may be subjected todamage from infestation, humidity, or temperature.//E. Alternate Source <strong>of</strong> Power (Type 1 EES)The alternate source <strong>of</strong> power shall be one or more diesel engine-driven generator sets.Provide fuel supply for 24 hours <strong>of</strong> operation. Locate exhausts such that exhaust gases arenot entrained into the building air. Fuel tank(s) shall have leak detection means. Offeror shallbe responsible for corrective actions and remediation in the event <strong>of</strong> a tank malfunction or aviolation <strong>of</strong> EPA or local regulations. Offeror shall license or register tanks as required by EPAor local Authorities Having Jurisdiction.6.7.10 POWER MONITORING AND METERINGPower monitoring and metering are required to support energy use and conservations goals.6.7.11 ELECTRICAL ROOMS AND CLOSETS:No telecommunications equipment, other than telecommunications outlets, shall be placedwithin electrical rooms. Provide appropriate construction for the type <strong>of</strong> transformer(s)Part I: Basic Solicitation Requirements – Page 125 <strong>of</strong> 196Lessor __________ Gov’t. ____________________ <strong>of</strong> __________ Pages

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!