12.07.2015 Views

SFO Template - Office of Construction & Facilities Management Home

SFO Template - Office of Construction & Facilities Management Home

SFO Template - Office of Construction & Facilities Management Home

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MAY 2009SOLICITATION FOR OFFERS OUTPATIENT CLINIC <strong>SFO</strong> NO. VA-101-XX-RP-XXXX[INSERT LOCATION OF FACILITY]Room height shall be a minimum <strong>of</strong> 9 feet [2.74 m] above finished floor. Rooms shall not havea suspended ceiling.Sufficient space should be provided for UPS equipment.(3) Room EnvelopeRoom shall be enclosed with fire-rated construction in accordance with NFPA 75.(4) TIP Wire/Cable Interface AreaWithin the TER there will be an area designated that houses and locates all TIP conduit andcable pathway terminations coming into the room from TRs, HE room, MCR, and either thesingle or duplicated Entrance Rooms (DEMARC). This area will house the distribution cablemanagement system.This area shall be a minimum <strong>of</strong> 12 feet x 8 feet x 8 feet [3.7 m x 2.4 m x 2.4 m] in addition tothe minimum area required by the Telephone Equipment Room.(5) Heating, Ventilation, and Air ConditioningDesign Conditions: 64 ˚F [18 ˚C] to 75 ˚F [24 ˚C] dry bulb temperature, 30 to 55% relativehumidity.HVAC load calculations shall include the rectifiers and associated batteries. Coolingrequirements shall be based on system design with 30% reserve capacity. Cooling equipmentshall be dedicated to the room, and an N+1 configuration shall be provided for reliability.(6) PowerRefer to Paragraph 6.8.2C General Environmental, Power and Space Requirements.UPS system must provide power for a period <strong>of</strong> 4 hours. Power shall be distributed by PowerDistribution Units (PDUs).UPS equipment shall be sized based on the equipment requirements, plus future anticipatedgrowth. The initial design load shall not be less than 30% and not more than 70% <strong>of</strong> the UPScapacity.The UPS shall be monitored by the PCR SMS for power, alarms, and alarm history. The UPSshall have dry contacts or external alarm and control from the PCR SMS and one "C" contactfor local computer signaling. The UPS shall be provided with computer system shutdowns<strong>of</strong>tware and hardware connectivity as required.The sharing <strong>of</strong> the TER’s UPS is NOT allowed.The room shall be equipped with dedicated electrical panel(s) capable <strong>of</strong> providing 208/120V,3-phase, 4-wire power, with capacity designed for the equipment load plus future capacity.Each panel shall contain 20% spare electrical capacity and spare circuit breaker space.Provide a minimum <strong>of</strong> one quadraplex receptacle (two duplex) for each 8 linear feet [2.4 linearmeters] <strong>of</strong> wall space.Emergency Power Off (EPO) push buttons shall be installed according to NFPA 75.Part I: Basic Solicitation Requirements – Page 141 <strong>of</strong> 196Lessor __________ Gov’t. ____________________ <strong>of</strong> __________ Pages

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!