12.07.2015 Views

SFO Template - Office of Construction & Facilities Management Home

SFO Template - Office of Construction & Facilities Management Home

SFO Template - Office of Construction & Facilities Management Home

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MAY 2009SOLICITATION FOR OFFERS OUTPATIENT CLINIC <strong>SFO</strong> No. VA-101-XX-RP-XXXX[INSERT LOCATION OF FACILITY]PART VI SCHEDULE E--ROOM FINISH, DOORS & HARDWARESECTION 1 ROOM FINISH, DOOR AND HARDWARE SCHEDULE--GENERALSchedule E lists each type <strong>of</strong> space or room required in the outpatient clinic. The followinginformation is listed for each space in the Schedule:Department, Area and FunctionFloor, Wall and Ceiling FinishesDoor Symbol and Hardware SetIf the Lessor believes that there are spaces or conditions not included in this Schedule, thequestion shall be referred to the Contracting <strong>Office</strong>r.1.1 ROOM FINISHES, DOOR AND HARDWARE SCHEDULE1.1.1 USE OF SCHEDULE ETHE REQUIREMENTS IN THIS SCHEDULE APPLY TO ALL SPACES TO BEOCCUPIED BY VA IN THE OUTPATIENT CLINIC. LESSOR SHALL PROVIDEMATERIALS, FINISHES, DOORS, FRAMES, AND HARDWARE IN ACCORDANCEWITH THIS SCHEDULE AND THE REQUIREMENTS SPECIFIED IN THIS <strong>SFO</strong>.Lessor shall provide each space with door(s) <strong>of</strong> the type and size as listed in Schedule E withhardware as noted. Doors and hardware requirements are indicated by their respective doorsymbols and hardware set numbers in this Schedule. Additional requirements are defined inParagraph 1.3, "Doors and Hardware".The Lessor shall provide room finishes in each room in accordance with Schedule E. Finishesare shown in the schedule for the floor, base, wainscot, wall, and ceiling surfaces for eachroom or space. The following are abbreviations used for materials and codes throughout theroom finishes, door, and hardware schedule. The Lessor shall coordinate abbreviations usedin the construction documents prepared by the Lessor with the abbreviations and symbolsused in this <strong>SFO</strong>.ADOAFATAT(SP)AT(TG)AWFAWPBPBRCCMUAutomatic Door OperatorAccess FlooringAcoustical Ceiling (Tile)Acoustical Ceiling (with Sprayed Plastic Finish)Acoustical Ceiling (with Tegular Edge)Acoustical Wall Fabric (Tackable)Acoustical Wall PanelBrick Pavers (Unit Pavers)Brick (Unit Masonry)ConcreteConcrete Masonry Units (Unit Masonry)Part VI: Schedule E – Room Finish, Door & Hardware -- Page 3 <strong>of</strong> 30Lessor __________ Gov’t. ____________________ <strong>of</strong> __________ Pages

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!