12.07.2015 Views

SFO Template - Office of Construction & Facilities Management Home

SFO Template - Office of Construction & Facilities Management Home

SFO Template - Office of Construction & Facilities Management Home

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MAY 2009SOLICITATION FOR OFFERS OUTPATIENT CLINIC <strong>SFO</strong> NO. VA-101-XX-RP-XXXX[INSERT LOCATION OF FACILITY]insulated stranded copper wire (or equal copper braid). All frames and cabinets shall begrounded in accordance with ANSI/TIA/EIA-607.The telecommunications grounding system will comply with ANSI/TIA/EIA-607 requirementsand follow BICSI – Telecommunications Distribution Methods Manual (Latest Edition)guidelines.(7) SecurityComply with Physical Security Criteria in Paragraph 4.2.4 PHYSICAL SECURITY ANDNATURAL DISASTERS RESISTIVE DESIGN and as follows. Provide electronic securitysystem that is connected to and fully functional with the PCR SMTS and a cipher lock withnumeric keypad, associated electronic card access device, and electric strike. Each roomsecurity system shall be powered from either the building or a local UPS system.Each programmable door control shall be fully functional with the SMTS in a stand-alonestatus if its connection to the controller is cut. Once the connection is restored, the local doorcontrol system shall update the SMTS on all operations that occurred after the connection wasinterrupted, and the SMTS shall update the local door control units to current operationalfunction.(8) Wire <strong>Management</strong>Refer to Paragraph 6.8.1 for requirements.D. Telephone Console Room (Optional)(1) ConfigurationSpace shall be per the following table:Telephone Console Room Size RequirementsNUMBER OF CONSOLES SPACE REQUIRED SQ M (SQ FT)1 100 [9]2 150 [14]3 200 [19]Provide a restroom and break room, separate from the operations area.(2) Heating, Ventilation, and Air ConditioningRefer to Paragraph 6.8.2C General Environmental, Power and Space Requirements-Heating,Ventilation, and Air Conditioning.(3) PowerRefer to Paragraph 6.8.2C General Environmental, Power and Space Requirements.Provide sufficient 120V receptacles at each operator position.(4) Alarm PanelsProvide adequate space, heating and cooling, power, lighting, and telecommunicationsraceways for alarm panels as required for each project. At a minimum, provide for nurse callCode One (Blue), public address, emergency notification, duress alarm, fire alarm, andemergency and standby generator alarm annunciator panels.Part I: Basic Solicitation Requirements – Page 135 <strong>of</strong> 196Lessor __________ Gov’t. ____________________ <strong>of</strong> __________ Pages

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!