12.07.2015 Views

SFO Template - Office of Construction & Facilities Management Home

SFO Template - Office of Construction & Facilities Management Home

SFO Template - Office of Construction & Facilities Management Home

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MAY 2009SOLICITATION FOR OFFERS OUTPATIENT CLINIC <strong>SFO</strong> NO. VA-101-XX-RP-XXXX[INSERT LOCATION OF FACILITY](4) Tip Wire/Cable Interface AreaProvide a wall area, minimum size <strong>of</strong> 8 feet x 8 feet [2.4 m x 2.4m] (plywood covered, toprovide a common termination point for all the cabling entering and leaving the HE Room).(5) Heating, Ventilation, and Air ConditioningRefer to Paragraph 6.8.2C General Environmental, Power and Space Requirements.A fully climate-controlled, standalone equipment cabinet is acceptable for each special systemin lieu <strong>of</strong> fully acclimatizing the HE Room.(6) PowerRefer to Paragraph 6.8.2C General Environmental, Power and Space Requirements.(7) GroundingProvide a copper bus plate minimum 6 in [150 mm] w x 18in [470 mm] L x 0.5 in [13 mm], witha connection point located on the inside wall within the immediate area <strong>of</strong> the antenna coaxialcable(s) entrance conduit sleeves. Connect this plate to the lightning protection system with aminimum #1/0 (AWG) stranded copper wire, or increased sized connection device (i.e., strap,buss, etc.), as approved by the RE, to maintain the integrity <strong>of</strong> the lightning protection systemso each <strong>of</strong> the system antenna cables’ coaxial cable lightning protector can be installed andconnected to the plate.Refer to Paragraph 6.8.2C General Environmental, Power and Space Requirements foradditional requirements.(8) Wire <strong>Management</strong>Refer to Paragraph 6.8.1 for additional requirements.The HE Room shall be provided with waterpro<strong>of</strong> wall entrance sleeves to allow connecting <strong>of</strong>each outside antenna coaxial cable to the HE Room equipment. Add extra like sleeves foradditional outside-mounted antennas as required by system design. One <strong>of</strong> these sleevesshall contain only the lightning protection connection.The HE Room shall be provided with a minimum separate 6 in [150 mm] x 6 in [150 mm] cableduct/ladder/wireway from the designated TIP interface point to the dedicated waterpro<strong>of</strong>locking 24" x 24" x 12" [600 mm x 600 mm x 300 mm] TIP connection enclosure. A minimum12" cable ladder may be used for this purpose. A minimum <strong>of</strong> five (5) each 3" conduits may beprovided in lieu the cable duct/ladder/wireway; additional cable duct/ladder/wireway shall beprovided based on overall system design.The mixing <strong>of</strong> coaxial cables and STP/UTP/fiber optic/AC and DC power wiring within thecable duct/ladder/wireway and/or conduits is not allowed.Each wire/cable connection point shall be provided with a connection MDF capability androutes to connect the room’s internal wire management system to the facility’s TIP system.F. Telecommunications Room (TR)Rooms shall be provided in the quantities and locations that will limit telephone/data/specialsystems TIP cable/wire runs from the Telecommunications Room to the outlets to a maximum<strong>of</strong> 300 feet [90 m]. Splicing <strong>of</strong> cables is not allowed. Terminal cabinets shall not be used inlieu <strong>of</strong> Telecommunications Rooms.Part I: Basic Solicitation Requirements – Page 137 <strong>of</strong> 196Lessor __________ Gov’t. ____________________ <strong>of</strong> __________ Pages

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!