12.07.2015 Views

SFO Template - Office of Construction & Facilities Management Home

SFO Template - Office of Construction & Facilities Management Home

SFO Template - Office of Construction & Facilities Management Home

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MAY 2009SOLICITATION FOR OFFERS OUTPATIENT CLINIC <strong>SFO</strong> NO. VA-101-XX-RP-XXXX[INSERT LOCATION OF FACILITY]corporate seal that sets forth all <strong>of</strong>ficers <strong>of</strong> the corporation and indicates which are authorizedto bind the corporation.Complete, sign, and date <strong>of</strong>fer.NOTE: OFFER MUST BE RECEIVED BY 4:00 PM (ET) ON THE DATE SPECIFIED INPARAGRAPH 1.5, AT THE ADDRESS CONTAINED IN PARAGRAPH 1.7 OF THISSOLICITATION. ENVELOPE SHOULD BE IDENTIFIED IN THE LOWER LEFTHANDCORNER WITH THE WORDS:"[insert location <strong>of</strong> project] OPC – <strong>SFO</strong> NO. VA-101-XX-RP-XXXX"10.7 DRAWINGS AND SPECIFICATIONS – SUBMISSION WITH OFFEROfferor shall submit drawings and specifications on six discs (CD-Rom as specified inParagraph 1.7.1) and two hard copy sets <strong>of</strong> drawings and specifications with the followingminimum information. Format and for hard copy submittal shall be as follows:(1) DrawingsHard copies shall be black line prints on bond paper, full size (30" x 42"). Each set shallcontain all sheets for all disciplines.(2) SpecificationsHard copies shall be printed on 8½" x 11" bond paper. Materials may be one-sided or doublesided copies. Each copy shall contain all sections. Organize and tab materials by discipline.NOTE 1: Failure to provide drawings and specifications in accordance with the requirementsabove may cause the <strong>of</strong>fer to be deemed unacceptable and rejected accordingly.NOTE2: The conceptual floor diagram provided by VA as a part <strong>of</strong> this Solicitation is intendedto convey desired floor locations and adjacency relationships <strong>of</strong> the main components <strong>of</strong> theprogram. The interior layout and footprint <strong>of</strong> the building may vary as a result <strong>of</strong> actual siteconditions and building design development. The number and location <strong>of</strong> doors will vary asthe Offeror develops detailed plans. The conceptual diagram also shows rooms dedicated tobuilding services. The size and location <strong>of</strong> these rooms will vary as the Offeror developsdetailed plans. It is the Offeror’s responsibility to design the building to comply with applicableBuilding Codes and ordinances. Offerors are advised that rent payment will not be madefor delivered space that is in excess <strong>of</strong> the maximum NUSF solicited.NOTE 3: All drawings shall be prepared per VHA National CAD Standard Application Guide,available on the VA Technical Information Library (TIL) website athttp://www.cfm.va.gov/til/projReq.asp. Drawings shall be on Architectural E-size sheets(30x42 inches). Title blocks shall identify the Offeror and shall include Solicitation Number,Clinic Name, and Location. Drawings shall be organized by discipline and shall include thefollowing minimum information.10.7.2 SITE PLAN(S)Minimum scale 1"=40’ or per local jurisdictions standard requirements, whichever is greater.Plan(s) shall show all site and building demolition, and all site improvements including grading,exterior equipment location, parking, vehicle and pedestrian circulation, storm water retention,Part I: Basic Solicitation Requirements – Page 192 <strong>of</strong> 196Lessor __________ Gov’t. ____________________ <strong>of</strong> __________ Pages

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!