12.07.2015 Views

SFO Template - Office of Construction & Facilities Management Home

SFO Template - Office of Construction & Facilities Management Home

SFO Template - Office of Construction & Facilities Management Home

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MAY 2009SOLICITATION FOR OFFERS OUTPATIENT CLINIC <strong>SFO</strong> NO. VA-101-XX-RP-XXXX[INSERT LOCATION OF FACILITY]Acoustical units shall be mineral fiber units that provide a noise reduction coefficient (NRC) <strong>of</strong>at least 0.55 and a ceiling attenuation class (CAC) rating <strong>of</strong> at least 33. Provide units withmanufacturer’s standard white painted finish, except provide membrane faced (mylar) units in//kitchen and other //locations scheduled for non-absorbent, scrubbable finish. Ceiling unitsshall have a flame-spread <strong>of</strong> 25 or less and a smoke development rating <strong>of</strong> 50 or less (ASTME-84).7.7.2 CUBICLE CURTAIN TRACKSProvide cubicle curtain tracks with carriers and hooks in exam rooms and other locationsindicated in Schedule B for privacy.Provide surface-mounted tracks <strong>of</strong> extruded aluminum, ASTM B221, alloy 6063, temper T5 orT6, channel shaped, with smooth inside raceway for curtain carriers. End stop connectors,ceiling flanges and other accessories shall be fabricated from the same material with the samefinish as the tracks or from nylon.Curtain carriers shall be nylon or delrin, with either nylon or delrin wheels on metal, delrin, ornylon axles. Equip each carrier with either stainless steel, chromium-plated brass or steelhooks with swivel, or nickel chromium-plated brass or stainless steel bead chain and hookassembly. Alternatively, delrin carriers may have molded-on delrin hooks. Hook for beadchain may be the same material and finish as the bead chain or may be chromium-platedsteel. Provide 2.2 carriers for every foot (or fraction there<strong>of</strong>) <strong>of</strong> each section <strong>of</strong> each tracklength, plus one additional carrier.At end <strong>of</strong> each section <strong>of</strong> track, make provision for insertion and removal <strong>of</strong> carriers. Design toprevent accidental removal <strong>of</strong> carrier. Any operating mechanism shall be removable withcommon tools.VA will supply and maintain fabric cubicle curtains.7.8 FLOORINGAn estimate <strong>of</strong> base quantities <strong>of</strong> each type <strong>of</strong> flooring that should be included in the proposedrental rate is indicated in Schedule C. Adjustments will be made at the end <strong>of</strong> the constructionbased on actual measurement and payment will be made per the pre-negotiated unit cost forthese items.Flooring material specifications and installation methods shall conform to the requirements <strong>of</strong>this <strong>SFO</strong> and referenced national standards. Under floor concrete must be smooth and level.Patching and leveling compounds containing gypsum are prohibited. When floor coveringsare newly installed or changed, samples must be approved in advance by the Contracting<strong>Office</strong>r.Unless other material is scheduled for a room or area, perimeter base shall be rubber or vinylcomplying with ASTM F1861. Base shall be 1/8-inch thick, 4 inches high with molded top.Style B (cove) shall be used throughout.Part I: Basic Solicitation Requirements – Page 158 <strong>of</strong> 196Lessor __________ Gov’t. ____________________ <strong>of</strong> __________ Pages

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!