02.12.2012 Views

Draft Environmental Impact Report - California Off Highway Vehicle ...

Draft Environmental Impact Report - California Off Highway Vehicle ...

Draft Environmental Impact Report - California Off Highway Vehicle ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.5 Biological Resources<br />

or during canal enhancement activities during the dry season, thus minimizing any temporary<br />

disturbances to wildlife movement.<br />

Because the General Plan would not include any actions that would permanently disrupt this<br />

potential wildlife corridor, and because the General Plan includes guidelines that would minimize<br />

temporary impacts in this area, potential impacts on wildlife movement would be less than<br />

significant.<br />

Mitigation Measures: No mitigation is required.<br />

Headquarters Facilities <strong>Impact</strong> Analysis<br />

The impact analyses described above under “General Plan <strong>Impact</strong> Analysis” address potential<br />

impacts related to all aspects of the General Plan, including constructing and operating the<br />

headquarters facilities. The discussion of the potential loss of or disturbance to special‐status<br />

plants (<strong>Impact</strong> 3.5‐1) is also applicable to construction and operation of the headquarters facilities<br />

alone; therefore, no additional analysis related to the headquarters facilities is necessary.<br />

Likewise, the discussion of the potential loss of special‐status and nesting migratory bird species<br />

(<strong>Impact</strong> 3.5‐6) is applicable to the headquarters facilities alone and no additional analysis is<br />

necessary.<br />

No migratory corridors are within the headquarters area; therefore, this issue is not discussed<br />

further.<br />

The following analyses address potential impacts specific to the construction or operation of the<br />

headquarters facilities alone. These potential impacts are different from (e.g., less than) the<br />

potential impacts described above which could be caused by implementing the rest of the General<br />

Plan elements.<br />

IMPACT<br />

3.5-8<br />

Potential Fill of Waters of the U.S., Including Wetlands, or Sensitive Vegetation Communities<br />

from Construction of the Headquarters Facilities<br />

The headquarters facilities were designed and sited to avoid the fill of any waters of the U.S.,<br />

including wetlands, or sensitive vernal pool habitat (see Figure 4.1 in the Clay Pit SVRA General<br />

Plan). Therefore, the project would cause no impact.<br />

Mitigation Measures: No mitigation is required.<br />

Clay Pit State Vehicular Recreation Area<br />

<strong>Draft</strong> EIR 3.5-15 February2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!