3.5 Biological Resources<br />
or during canal enhancement activities during the dry season, thus minimizing any temporary<br />
disturbances to wildlife movement.<br />
Because the General Plan would not include any actions that would permanently disrupt this<br />
potential wildlife corridor, and because the General Plan includes guidelines that would minimize<br />
temporary impacts in this area, potential impacts on wildlife movement would be less than<br />
significant.<br />
Mitigation Measures: No mitigation is required.<br />
Headquarters Facilities <strong>Impact</strong> Analysis<br />
The impact analyses described above under “General Plan <strong>Impact</strong> Analysis” address potential<br />
impacts related to all aspects of the General Plan, including constructing and operating the<br />
headquarters facilities. The discussion of the potential loss of or disturbance to special‐status<br />
plants (<strong>Impact</strong> 3.5‐1) is also applicable to construction and operation of the headquarters facilities<br />
alone; therefore, no additional analysis related to the headquarters facilities is necessary.<br />
Likewise, the discussion of the potential loss of special‐status and nesting migratory bird species<br />
(<strong>Impact</strong> 3.5‐6) is applicable to the headquarters facilities alone and no additional analysis is<br />
necessary.<br />
No migratory corridors are within the headquarters area; therefore, this issue is not discussed<br />
further.<br />
The following analyses address potential impacts specific to the construction or operation of the<br />
headquarters facilities alone. These potential impacts are different from (e.g., less than) the<br />
potential impacts described above which could be caused by implementing the rest of the General<br />
Plan elements.<br />
IMPACT<br />
3.5-8<br />
Potential Fill of Waters of the U.S., Including Wetlands, or Sensitive Vegetation Communities<br />
from Construction of the Headquarters Facilities<br />
The headquarters facilities were designed and sited to avoid the fill of any waters of the U.S.,<br />
including wetlands, or sensitive vernal pool habitat (see Figure 4.1 in the Clay Pit SVRA General<br />
Plan). Therefore, the project would cause no impact.<br />
Mitigation Measures: No mitigation is required.<br />
Clay Pit State Vehicular Recreation Area<br />
<strong>Draft</strong> EIR 3.5-15 February2012