Chapter 6.0 – Alternatives to the Proposed Project<br />

6.0 Alternatives to the Proposed Action<br />

State CEQA Guidelines Section 15126.6 details the guiding principles for analyzing alternatives in<br />

this DEIR:<br />

consider alternatives that could reduce or eliminate any significant environmental impacts<br />

of the proposed project (the Clay Pit SVRA General Plan), including alternatives that may be<br />

more costly or could otherwise impede the project’s objectives; and<br />

describe a range of reasonable alternatives to the project that could feasibly attain most of<br />

the basic objectives of the project;<br />

evaluate the comparative merits of the alternatives.<br />

The Clay Pit SVRA General Plan was developed concurrently with this DEIR. Development of the<br />

General Plan was guided by the goal to develop a management plan that avoids significant impacts<br />

on the environment. Thus, the General Plan is largely “self mitigating” and implementation of the<br />

Clay Pit SVRA General Plan would not result in significant impacts on the environment. Therefore,<br />

no alternatives exist that could reduce or eliminate significant environmental impacts. However,<br />

the alternatives presented in this chapter each have the potential of minimizing several less‐than‐<br />

significant impacts..<br />

Because the General Plan was developed with the intent to attain all project objectives while<br />

minimizing environmental impacts, it is difficult to develop alternatives that could reduce<br />

environmental impacts while feasibly attaining most of the project objectives. Therefore, this<br />

chapter describes a range of reasonable alternatives that could attain some of the project<br />

objectives.<br />

This chapter evaluates the merits of the alternatives compared with the proposed project, the Clay<br />

Pit SVRA General Plan, as described in Chapter 4 of the General Plan.<br />

The following three project alternatives are shown alongside the proposed project in Figure 6‐1:<br />

the No‐Project Alternative,<br />

the Reduced Developed Use Area Alternative, and<br />

the Conservation Alternative.<br />

The headquarters facilities would be constructed regardless of the alternative selected (except the<br />

No‐Project Alternative); thus, any impacts attributed to the headquarters would occur under each<br />

development alternative.<br />

Clay Pit State Vehicular Recreation Area<br />

<strong>Draft</strong> EIR 6-1 February 2012