1.7 DEIR Contents and Organization<br />
1.0 Introduction<br />
Summary: A summary is included at the beginning of this document to provide simple reference<br />
to the conclusions of the analyses presented in this DEIR. Also addressed in the summary are<br />
issues of known controversy, environmental issues to be resolved, and alternatives considered.<br />
Chapter 1.0, “Introduction”: This chapter provides an introduction and overview describing the<br />
purpose of the DEIR and the CEQA process, a brief overview of the OHMVR Division planning and<br />
public outreach process, comments received on the scope of this DEIR, and a description of future<br />
subsequent environmental review that may be required.<br />
Chapter 2.0, “Project Description”: This chapter provides information on the environmental<br />
setting, information about past and current use of Clay Pit SVRA, project objectives, Clay Pit SVRA<br />
General Plan components and headquarters facilities included for analysis in this DEIR, regional<br />
planning context, and intended uses of this DEIR.<br />
Chapter 3.0, “<strong>Environmental</strong> Analysis”: This chapter evaluates the potential environmental<br />
impacts of the Clay Pit SVRA General Plan and headquarters facilities. This chapter also presents<br />
those goals and guidelines within the General Plan that would reduce those potential impacts.<br />
Chapter 4.0, “Cumulative Analysis”: This chapter analyzes the potential cumulative impacts of<br />
the Clay Pit SVRA General Plan and headquarters facilities in combination with past, present, and<br />
future projects.<br />
Chapter 5.0, “Other CEQARequired Analysis”: Other CEQA‐required analyses provided in this<br />
chapter include environmental effects eliminated from future analysis, unavoidable significant<br />
environmental effects, significant irreversible environmental changes, and growth‐inducing<br />
impacts.<br />
Chapter 6.0, “Alternatives to the Proposed Action”: This chapter considers a reasonable range<br />
of potentially feasible alternatives to the Clay Pit SVRA General Plan that could avoid or<br />
substantially lessen any of the significant effects of the project identified in Chapter 3.0. Analysis of<br />
the No‐Project Alternative is included, as well as identification of the environmentally superior<br />
alternative, as required by CEQA.<br />
Chapter 7.0, “References”: This chapter contains a complete list of all references used during the<br />
preparation of this DEIR, as well as citations for personal communications.<br />
Chapter 8.0, “<strong>Report</strong> Contributors”: This chapter contains a complete list of the DEIR preparers<br />
and contributors.<br />
Table 1‐1 lists the location of CEQA‐required content in this DEIR.<br />