02.12.2012 Views

Draft Environmental Impact Report - California Off Highway Vehicle ...

Draft Environmental Impact Report - California Off Highway Vehicle ...

Draft Environmental Impact Report - California Off Highway Vehicle ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1.7 DEIR Contents and Organization<br />

1.0 Introduction<br />

Summary: A summary is included at the beginning of this document to provide simple reference<br />

to the conclusions of the analyses presented in this DEIR. Also addressed in the summary are<br />

issues of known controversy, environmental issues to be resolved, and alternatives considered.<br />

Chapter 1.0, “Introduction”: This chapter provides an introduction and overview describing the<br />

purpose of the DEIR and the CEQA process, a brief overview of the OHMVR Division planning and<br />

public outreach process, comments received on the scope of this DEIR, and a description of future<br />

subsequent environmental review that may be required.<br />

Chapter 2.0, “Project Description”: This chapter provides information on the environmental<br />

setting, information about past and current use of Clay Pit SVRA, project objectives, Clay Pit SVRA<br />

General Plan components and headquarters facilities included for analysis in this DEIR, regional<br />

planning context, and intended uses of this DEIR.<br />

Chapter 3.0, “<strong>Environmental</strong> Analysis”: This chapter evaluates the potential environmental<br />

impacts of the Clay Pit SVRA General Plan and headquarters facilities. This chapter also presents<br />

those goals and guidelines within the General Plan that would reduce those potential impacts.<br />

Chapter 4.0, “Cumulative Analysis”: This chapter analyzes the potential cumulative impacts of<br />

the Clay Pit SVRA General Plan and headquarters facilities in combination with past, present, and<br />

future projects.<br />

Chapter 5.0, “Other CEQA­Required Analysis”: Other CEQA‐required analyses provided in this<br />

chapter include environmental effects eliminated from future analysis, unavoidable significant<br />

environmental effects, significant irreversible environmental changes, and growth‐inducing<br />

impacts.<br />

Chapter 6.0, “Alternatives to the Proposed Action”: This chapter considers a reasonable range<br />

of potentially feasible alternatives to the Clay Pit SVRA General Plan that could avoid or<br />

substantially lessen any of the significant effects of the project identified in Chapter 3.0. Analysis of<br />

the No‐Project Alternative is included, as well as identification of the environmentally superior<br />

alternative, as required by CEQA.<br />

Chapter 7.0, “References”: This chapter contains a complete list of all references used during the<br />

preparation of this DEIR, as well as citations for personal communications.<br />

Chapter 8.0, “<strong>Report</strong> Contributors”: This chapter contains a complete list of the DEIR preparers<br />

and contributors.<br />

Table 1‐1 lists the location of CEQA‐required content in this DEIR.<br />

Clay Pit State Vehicular Recreation Area<br />

<strong>Draft</strong> EIR 1-9 February 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!