02.12.2012 Views

Draft Environmental Impact Report - California Off Highway Vehicle ...

Draft Environmental Impact Report - California Off Highway Vehicle ...

Draft Environmental Impact Report - California Off Highway Vehicle ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.7 Geology and Soils<br />

As noted under “General Plan <strong>Impact</strong> Analysis” above, percolation test results indicate that soils<br />

on‐site generally have very slow infiltration properties, which would make them incompatible<br />

with a standard gravity‐fed septic system. Therefore, the septic system that would serve the<br />

sanitary facilities proposed at the headquarters facilities would require special engineering (e.g.,<br />

an aboveground leach field). Soils Guideline 1.6 and DU Guideline 3.1 require that development of<br />

facilities comply with all regulatory requirements related to soil safety. Accordingly, an on‐site<br />

wastewater site evaluation would be conducted to determine the appropriate system design for<br />

wastewater disposal on the site, and a compatible system would be constructed on‐site.<br />

Implementation of this guideline would result in less­than­significant impacts.<br />

Mitigation Measures: No mitigation is required.<br />

3.7.5 Summary of Significant <strong>Impact</strong>s<br />

Adoption of the Clay Pit SVRA General Plan and implementation of resulting actions would not<br />

result in significant impacts on geology and soils resources. Constructing and operating the<br />

headquarters facilities would not result in significant impacts on geology and soils resources.<br />

3.7.6 Mitigation Measures<br />

No significant impacts on geology and soils resources would result with implementation of the<br />

Clay Pit SVRA General Plan, including construction and operation of the headquarters facilities,<br />

and no mitigation is required.<br />

Clay Pit State Vehicular Recreation Area<br />

<strong>Draft</strong> EIR 3.7-9 February 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!