31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

name of Project and Contractor, equipment number, and approximate weight.Include complete packing list and bill of materials with each shipment.C. Extra Materials, Special Tools, Test Equipment, and Expendables:1. Furnish as required by individual Specifications.2. Schedule:a. Ensure that shipment and delivery occurs concurrent withshipment of associated equipment.b. Transfer to Owner shall occur immediately subsequent toContractor’s acceptance of equipment from Supplier.3. Packaging and Shipment:a. Package and ship extra materials and special tools to avoiddamage during long term storage in original cartons insofar aspossible, or in appropriately sized, hinged-cover, wood, plastic, ormetal box.b. Prominently displayed on each package, the following:1) Manufacturer’s part nomenclature and number, consistentwith Operation and Maintenance Manual identificationsystem.2) Applicable equipment description.3) Quantity of parts in package.4) Equipment manufacturer.4. Deliver materials to Site.5. Notify <strong>Construction</strong> Manager upon arrival for transfer of materials.6. Replace extra materials and special tools found to be damaged orotherwise inoperable at time of transfer to Owner.D. Request a minimum 7-day advance notice of shipment from manufacturer.E. Factory Test Results: Reviewed and accepted by Engineer before productshipment as required in individual Specification sections.1.05 DELIVERY AND INSPECTIONA. Deliver products in accordance with accepted current Progress Schedule andcoordinate to avoid conflict with the Work and conditions at Site. Deliveranchor bolts and templates sufficiently early to permit setting prior toplacement of structural concrete.B. Deliver products in undamaged condition, in manufacturer’s original containeror packaging, with identifying labels intact and legible. Include on label, dateof manufacture and shelf life, where applicable.COMMON PRODUCT REQUIREMENTSPW/WBG/38205901 61 00 - 2 AUGUST 15, 2012©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!