31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

E. Vibration Testing:3.04 CLEANING1. Perform field testing on rotating equipment, where specified inSection 23 05 93, Testing, Adjusting, and Balancing for HVAC, todetermine actual operating vibration.2. If vibration limits described therein are exceeded, rebalance equipmentin-place until design tolerances are met.A. On completion of installation, internally clean fans according tomanufacturer’s written instructions. Remove foreign material and constructiondebris. Vacuum fan wheel and cabinet.B. After completing system installation, including outlet fitting and devices,inspect exposed finish. Remove burrs, dirt, and construction debris, and repairdamaged finishes.3.05 MANUFACTURER’S SERVICESA. Provide manufacturer’s representative at site in accordance withSection 01 43 33, Manufacturers’ Field Services, for installation assistance,inspection and certification of proper installation, equipment testing, andstartup assistance personnel for specified component, subsystem, equipment,or system.B. Manufacturer’s Representative: Present at Site for minimum person-dayslisted below, travel time excluded:1. 1/2 person-days for installation assistance and inspection.2. 1/2 person-days for functional and performance testing and completionof Manufacturer’s Certificate of Proper Installation.C. Refer Section 01 43 33, Manufacturers’ Field Services and Section 01 91 14,Equipment Testing and Facility Startup.3.06 SUPPLEMENTSA. The supplements listed below, following “End of Section,” are a part of thisSpecification.1. 23 77 00.01, Air Handling Units Schedule.END OF SECTIONAIR HANDLING UNITSPW/WBG/38205923 77 00 - 20 AUGUST 15, 2012©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!