1.07 SCHEDULE ACCEPTANCEA. Engineer’s acceptance will demonstrate agreement that:1. Proposed schedule is accepted with respect to:a. Contract Times, including Final Completion and all intermediateMilestones are within the specified times.b. Specified Work sequences and constraints are shown as specified.c. Specified Owner-furnished Equipment or Material arrival dates,or range of dates, are included if applicable.d. Access restrictions are accurately reflected.e. Startup and testing times are as specified.f. Submittal review times are as specified.g. Startup testing duration is as specified and timing is acceptable.2. In all other respects, Engineer’s acceptance of Contractor’s scheduleindicates that, in Engineer’s judgment, schedule represents reasonableplan for constructing Project in accordance with the ContractDocuments. Engineer’s review will not make any change in Contractrequirements. Lack of comment on any aspect of schedule that is not inaccordance with the Contract Documents will not thereby indicateacceptance of that change, unless Contractor has explicitly called thenonconformance to Engineer’s attention in submittal. Schedule remainsContractor’s responsibility and Contractor retains responsibility forperforming all activities, for activity durations, and for activitysequences required to construct Project in accordance with the ContractDocuments.B. Unacceptable Preliminary Progress Schedule:1. Make requested corrections; resubmit within 10 days.2. Until acceptable to Engineer as Baseline Progress Schedule, continuereview and revision process, during which time Contractor shall updateschedule on a monthly basis to reflect actual progress and occurrencesto date.C. Unacceptable Detailed Progress Schedule:1. Make requested corrections; resubmit within 10 days.2. Until acceptable to Engineer as Baseline Progress Schedule, continuereview and revision process.D. Narrative Report: All changes to activity duration and sequences, includingaddition or deletion of activities subsequent to Engineer’s acceptance ofBaseline Progress Schedule, shall be delineated in Narrative Report currentwith proposed Updated Progress Schedule.CONSTRUCTION PROGRESSPW/WBG/382059DOCUMENTATION AUGUST 15, 201201 32 00 - 6 ©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!