31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OWNERMANUFACTURER’S CERTIFICATE OF PROPER INSTALLATIONEQPT TAG NO:PROJECT NO:EQPT SERIAL NO:EQPT/SYSTEM:SPEC. SECTION:I hereby certify that the above-referenced equipment/system has been:(Check Applicable)Installed in accordance with Manufacturer’s recommendations.Inspected, checked, and adjusted.Serviced with proper initial lubricants.Electrical and mechanical connections meet quality and safety standards.All applicable safety equipment has been properly installed.Functional tests.System has been performance tested, and meets or exceeds specified performancerequirements. (When complete system of one manufacturer)Note: Attach any performance test documentation from manufacturer.Comments:I, the undersigned Manufacturer’s Representative, hereby certify that I am (i) a dulyauthorized representative of the manufacturer, (ii) empowered by the manufacturer toinspect, approve, and operate their equipment and (iii) authorized to makerecommendations required to ensure equipment furnished by the manufacturer is completeand operational, except as may be otherwise indicated herein. I further certify that allinformation contained herein is true and accurate.Date: _________________________________, 20___Manufacturer:By Manufacturer’s Authorized Representative:(Authorized Signature)PW/WBG/382059MANUFACTURERS’ FIELD SERVICESAUGUST 15, 2012 01 43 33 SUPPLEMENT 02 - 1©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!