3.05 FIELD QUALITY CONTROLA. Inspection:1. With Engineer, inspect precast architectural wall panels for chips,cracks, discoloration, and other damage.2. Compare every panel to approved mockup panel and finish samplepanel.3. Record location and condition of damaged or nonmatching panels.B. Resolution:3.06 PROTECTION1. Repair damage to satisfaction of Engineer and Owner.2. Remove panels with damage or repairs not acceptable to Engineer.3. Install new acceptable panels in place of those removed.4. Perform reinspection and obtain acceptance by Engineer.A. Protect precast units from chipping, spalling, cracking, or other damage to theunits after delivery to Site.B. After erection, protect units from damage.END OF SECTIONPRECAST CONCRETEPW/WBG/38205903 40 00 - 8 AUGUST 15, 2012©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!