31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 03 62 00NONSHRINK GROUTINGPART 1GENERAL1.01 REFERENCESA. The following is a list of standards which may be referenced in this section:1.02 SUBMITTALS1. ASTM International (ASTM):a. C230, Standard Specification for Flow Table for Use in Tests ofHydraulic Cement.b. C621, Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrinkable).c. C939, Standard Test Method for Flow of Grout for Preplaced-Aggregate Concrete (Flow Cone Method).d. C1107/C1107M, Standard Specification for Packaged Dry,Hydraulic-Cement Grout (Nonshrink).A. Action Submittals:1. Product data of grouts.2. Proposed method for keeping existing concrete surfaces wet prior toplacing grout.3. Forming method for fluid grout placements.4. Curing method for grout.B. Informational Submittals:1. Manufacturer’s Written Instructions:a. Adding fiber reinforcing to batching.b. Cement-water ratio of grout topping.c. Mixing of grout.2. Manufacturer’s proposed training schedule for grout work.3. Manufacturer’s Certificate of Compliance:a. Grout free from chlorides and other corrosion-causing chemicals.b. Nonshrink grout properties of Category II and Category III,verifying expansion at 3 days or 14 days will not exceed the28-day expansion and nonshrink properties are not based on gasor gypsum expansion.4. Manufacturer’s Certificate of Proper Installation.5. Statements of Qualification: Nonshrink grout manufacturer’srepresentative.PW/WBG/382059NONSHRINK GROUTINGAUGUST 15, 2012 03 62 00 - 1©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!