31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

a. Belt Drive (except Vane Axial): 0.15 in/sec peak velocity.b. Belt Drive Vane Axial: 0.08 in/sec peak velocity.c. Direct Drive: 0.08 in/sec peak velocity.d. Written records of run test and vibration test shall be madeavailable upon request.PART 3EXECUTION3.01 INSTALLATIONA. Install units level and plumb.B. Install floor-mounted units on concrete bases.C. Secure vibration controls to concrete bases using anchor bolts cast in concretebase.D. Secure roof-mounted units to rood curbs with Type 316 stainless steelhardware.E. Inspect internal casing insulation, seal all exposed edges, and butt joints withmastic to ensure insulation will not be loosened during operation.F. Labeling: In accordance with Article Accessories.G. Service Access: Locate units to provide access spaces required for filterchanging; motor, drive, and bearing servicing; and fan shaft and coil removal.H. Equipment Restraints:1. Restrain equipment against seismic forces as required by Code.2. Restrain equipment against wind loads as required by Code.3. Refer Section 23 05 48, Vibration Isolation.I. Connections:1. Isolate sheet metal duct connections from all noninternally springisolatedfan units or other rotating equipment.2. Install ductwork adjacent to fans so as to allow proper service andmaintenance.AIR HANDLING UNITSPW/WBG/38205923 77 00 - 18 AUGUST 15, 2012©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!