31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

a. Special Inspection and testing required by IBC Section 1704 andSection 1708, and other applicable sections and referencedstandards therein.b. Type and frequency of Special Inspection required.c. Type and frequency of testing required.d. Required frequency and distribution of testing and SpecialInspection reports to be distributed by Special Inspector toEngineer, Contractor, building official, and Owner.e. Geotechnical Observation to be Performed: Required frequencyand distribution of Geotechnical Observation reports by registereddesign professional to Contractor, building official, and Owner.B. Special Inspection of field construction will be performed by Owner’sregistered design professional in responsible charge.C. Owner’s plan for code required Special Inspection , as provided in Statementof Special Inspections on Drawings and further provided in this section, is forthe sole benefit of Owner and does not:1. Relieve Contractor of responsibility for providing adequate qualitycontrol measures.2. Relieve Contractor of responsibility for damage to or loss of materialbefore acceptance.3. Constitute or imply acceptance.4. Affect continuing rights of Owner after acceptance of completed Work.D. The presence or absence of code required Special Inspector does not relieveContractor from Contract requirements.E. Contractor is responsible for additional costs associated with SpecialInspection and Testing when Work is not ready at time identified byContractor, and Special Inspectors are on Site but not able to providecontracted services.F. Contractor is responsible for associated costs for additional Special Inspectionand Testing by Special Inspectors required due to rejection of materials of inplace Work that cannot be made compliant to Contract Document withoutadditional Site visits or testing.1.06 TESTINGA. Contractor-Furnished Material Testing:1. Contractor shall furnish and pay for the services of a qualified testingagency to perform laboratory and field testing of soils, concrete,masonry, metal, and other materials.SPECIAL INSPECTIONPW/WBG/382059AND TESTING AUGUST 15, 201201 45 33 - 4 ©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!