31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

10. Major structural, mechanical, equipment, electrical, architectural, andinstrumentation and control Work.11. System startup summary.12. Project close-out summary.13. Demobilization summary.C. Update Preliminary Progress Schedule monthly as part of progress paymentprocess. Failure to do so may result in the Owner withholding all or part of themonthly progress payment until the Preliminary Progress Schedule is updatedin a manner acceptable to Engineer.D. Format: In accordance with Article Progress Schedule—Critical PathNetwork.1.03 DETAILED PROGRESS SCHEDULEA. In addition to requirements of General Conditions, submit Detailed ProgressSchedule beginning with Notice to Proceed and continuing through FinalCompletion.B. Show the duration and sequences of activities required for completeperformance of the Work reflecting means and methods chosen by Contractor.C. When accepted by Engineer, Detailed Progress Schedule will replacePreliminary Progress Schedule and become Baseline Schedule. Subsequentrevisions will be considered as Updated Progress Schedules.D. Format: In accordance with Article Progress Schedule—Critical PathNetwork.E. Update monthly to reflect actual progress and occurrences to date, includingweather delays.1.04 PROGRESS SCHEDULE—CRITICAL PATH NETWORKA. General: Comprehensive computer-generated schedule using CPM, generallyas outlined in Associated General Contractors of America (AGC) 580,“<strong>Construction</strong> Project Planning and Scheduling Guidelines.” If a conflictoccurs between the AGC publication and this Specification, this Specificationshall govern.B. Contents:1. Schedule shall begin with the date of Notice to Proceed and concludewith the date of Final Completion.2. Identify Work calendar basis using days as a unit of measure.CONSTRUCTION PROGRESSPW/WBG/382059DOCUMENTATION AUGUST 15, 201201 32 00 - 2 ©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!