31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

until connected to new odor control ductwork as shown onDrawings.b. Install new supply air ductwork as shown on Drawings.10. Site Restoration and Paving: To be completed after all site work,building construction, and major equipment material deliveries havebeen completed. Paving replacement shall be done in two separableparts of work, north and south, in order to maintain Owner access toSolids Processing Building for dewatered cake and grit removal as wellas offsite sludge unloading.F. Process or Facility Shutdown:1. Provide 7 days advance written request for approval of need to shutdown a process or facility to Owner and Engineer.2. Power outages will be considered upon 72 hours written request toOwner and Engineer. Describe the reason, anticipated length of time,and areas affected by the outage. Provide temporary provisions forcontinuous power supply to critical facility components.3. Whole plant power outages will be limited to a duration of 2 hours andmust be scheduled during middle of night, dry weather, and low flowperiods.G. Install and maintain bypass facilities and temporary connections required tokeep Owner’s wastewater treatment and biosolids processing operations online.H. Do not proceed with Work affecting a facility’s operation without obtainingOwner’s and Engineer’s advance approval of the need for and duration of suchWork.I. Relocation of Existing Facilities:1. During construction, it is expected that minor relocations of Work willbe necessary.2. Provide complete relocation of existing structures, including piping,utilities, equipment, electrical conduit wiring, electrical duct bank, andother necessary items.3. Use only new materials for relocated facility. Match materials ofexisting facility, unless otherwise shown or specified.4. Perform relocations to minimize downtime of existing facilities.5. Install new portions of existing facilities in their relocated position priorto removal of existing facilities, unless otherwise accepted by Engineer.J. Conduct coordination meeting prior to any shutdown, tie-in or startup todiscuss the following:PROJECT COORDINATIONPW/WBG/38205901 31 13 - 8 AUGUST 15, 2012©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!