3.08 MORTAR REPAIR FAILED TESTA. Remove and replace unacceptable Work.B. Hollow Sounding Areas: Saw cut hollow sounding areas to a new squareedge. Remove unsound mortar repair. Prepare substrate surface and reapplyrepair mortar as specified herein above.C. Failed Compression Strength Test: Remove affected areas of repair mortarrepresented by failed compression strength test results. Prepare substratesurface and reapply repair mortar as specified herein above.D. Failed Bond Tests: Remove affected areas of repair mortar represented byfailed bond test results. Prepare substrate surface and reapply repair mortar asspecified herein above.E. Retest areas where repair mortar was removed and replaced, in accordancewith test requirements specified herein above.3.09 MANUFACTURER’S SERVICESA. Provide repair mortar system manufacturer’s representative at Site inaccordance with Section 01 43 33, Manufacturers’ Field Services, for reviewacceptability of surface preparation, mixing and installation assistance,inspection, and Certification of Proper Installation.END OF SECTIONREPAIR OF VERTICAL AND OVERHEADPW/WBG/382059CONCRETE SURFACES AUGUST 15, 201203 01 32 - 12 ©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!