3. Identify each submittal with the following:a. Numbering and Tracking System:1) Sequentially number each submittal.2) Resubmission of submittal shall have original number withsequential alphabetic suffix.b. Specification section and paragraph to which submittal applies.c. Project title and Engineer’s project number.d. Date of transmittal.e. Names of Contractor, Subcontractor or Supplier, and manufactureras appropriate.4. Identify and describe each deviation or variation from ContractDocuments.C. Format:1. Do not base Shop Drawings on reproductions of Contract Documents.2. Package submittal information by individual specification section. Donot combine different specification sections together in submittalpackage, unless otherwise directed in specification.3. Present in a clear and thorough manner and in sufficient detail to showkind, size, arrangement, and function of components, materials, anddevices, and compliance with Contract Documents.4. Index with labeled tab dividers in orderly manner.D. Timeliness: Schedule and submit in accordance Schedule of Submittals, andrequirements of individual Specification sections.E. Processing Time:1. Time for review shall commence on Engineer’s receipt of submittal.2. Engineer will act upon Contractor’s submittal and transmit response toContractor not later than 30 days after receipt, unless otherwisespecified.3. Resubmittals will be subject to same review time.4. No adjustment of Contract Times or Price will be allowed as a result ofdelays in progress of Work caused by rejection and subsequentresubmittals.F. Resubmittals: Clearly identify each correction or change made.G. Incomplete Submittals:1. Engineer will return entire submittal for Contractor’s revision ifpreliminary review deems it incomplete.2. When any of the following are missing, submittal will be deemedincomplete:SUBMITTAL PROCEDURESPW/WBG/38205901 33 00 - 2 AUGUST 15, 2012©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!