31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1.02 DEFINITIONSA. The following is a list of abbreviations which may be used in this Section:1.03 SUBMITTALS1. AC: Air Conditioning.2. COP: Coefficient of Performance.3. EER: Energy Efficiency Ratio.4. DX: Direct Expansion.5. HP: Heat Pump.6. IR: Infra Red.7. LED: Light Emitting Diode.8. PSC: Permanent Split Capacitor.9. PTAC: Packaged Terminal Air Conditioner.10. SPST: Single Pole, Single Throw.11. TXV: Thermostatic Expansion Valve.12. UV: Ultraviolet.A. Action Submittals:1. Shop Drawings:2. Complete specifications, descriptive drawings, catalog cuts, anddescriptive literature which shall include make, model, dimensions,weight of equipment, and electrical schematics for all productsspecified.3. Manufacturer’s standard finish color selection for enclosure finishes.4. Complete performance data that will indicate full compliance with thespecifications:a. Include fan sound power level data (ref. 10 to 12 watts) at designoperating point, based on AMCA Bulletin 300, Setup No. 1.b. Include heating and cooling performance data at design operatingconditions.5. Air Pressurization Unit: Documentation that media filter modules areUL rated Class 1.B. Informational Submittals:1. Detailed information on structural, mechanical, electrical, or othermodifications necessary to adapt arrangement or details shown toequipment furnished.2. Test reports.3. Operation and Maintenance Data in conformance with Section 01 78 23,Operation and Maintenance Data.a. Include wiring and control diagrams for equipment.UNITARY AIR-CONDITIONINGPW/WBG/382059EQUIPMENT AUGUST 15, 201223 81 00 - 2 ©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!