31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.10 EVAPORATION RETARDANTA. As specified in Section 03 39 00, Concrete Curing.2.11 CURING COMPOUNDA. As specified in Section 03 39 00, Concrete Curing.PART 3EXECUTION3.01 GENERALA. New Concrete Work: Repair deficiencies in new concrete structuresconstructed under this Contract with applicable repair system.B. Existing Concrete Work: Any areas damaged by demolition of concrete ormasonry.3.02 PREPARATIONA. Identify unsound and deteriorated concrete by sounding techniques, or asdirected by Engineer. Review proposed extent of repair with Engineer.B. Remove unsound, deteriorated, or otherwise defective areas of concrete fromwork areas.1. Use 8,000 psi minimum high-pressure water blasting machine, asappropriate to suit Site conditions.2. Remove concrete to abrade substrate concrete surface to a minimumamplitude roughness of 3/16 inch measured between high and lowpoints with a 3-foot-long straightedge, in accordance withASTM D4259.3. For existing structures, extent of concrete removal as shown onDrawings.4. Where final surface is required to be flush with existing adjacentsurface, remove existing concrete depth as required for application ofminimum thickness of repair mortar.C. Do not use power-driven jackhammers, chipping hammers, scabblers, orscarifiers unless water blasting is not permitted or practical due to Siteconditions, or may cause other damage to equipment or facilities. In suchcases where chipping hammers are required, limit size of chipping hammer toreduce formation of micro-fractures in substrate concrete surface.REPAIR OF HORIZONTALPW/WBG/382059CONCRETE SURFACES AUGUST 15, 201203 01 33 - 10 ©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!