31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

. Blades: Fiberglass reinforced plastic with resin as describedherein. Blade thickness and stiffeners as required to meet designconditions.c. Axles: Continuous FRP rod with resin as described herein. Axle toextend 6 inches beyond frame.d. Bearings: Molded PTFE.e. Blade Stops: FRP with resin as described herein.f. Blade Seals: Neoprene.g. Shaft Seals: Neoprene.h. Flanges: As specified to match ductwork flanges.2.04 SOURCE QUALITY CONTROLA. Factory Inspection: Inspect fabrications for required construction, intendedfunction and conformance with referenced standards.B. Inspection of products is required prior to shipment, unless specifically waivedin writing by Engineer.C. Notify Engineer 1 week prior to estimated date of inspection.D. Repairs authorized by Engineer shall be reinspected before final acceptance,unless specifically waived.PART 3EXECUTION3.01 PREPARATIONA. Verify dimensions and conditions in field.B. Layout routing in straight lines parallel to building lines.C. Coordinate support locations with layout and joints.3.02 INSTALLATIONA. Ductwork:1. Cut, fit, and install in accordance with duct manufacturer’srecommendations. The SMACNA manual may be used for guidance,but duct manufacturer’s recommendations shall take precedence.2. Seal cut edges with compatible resin.3. Ductwork shall be free of vibration when in operation. Vibrationisolation devices shall be provided and installed by Contractor.4. Install plumb and straight and in proper alignment.5. Provide for expansion and contraction of ductwork and fittings.PW/WBG/382059THERMOSET FIBERGLASS-REINFORCEDAUGUST 15, 2012PLASTIC DUCTS AND ACCESSORIES©COPYRIGHT 2012 CH2M HILL 23 31 16.16 - 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!