31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6. Leased Equipment, When Idle (Standby): Idle or standby equipment isequipment onsite or in transit to and from the Work Site and necessary toperform the Work under the modification, but not in actual use. Idleequipment time, as documented by Engineer, shall be paid at the leasingrate determined above, excluding operational costs.7. Owned and Other Equipment in Use: Equipment rates for ownedequipment or equipment provided in other than arm’s length transactionshall not exceed the single shift total hourly costs rate developed inaccordance with the CRG and as modified herein for multiple shifts. Thistotal hourly rate will be paid for each hour the equipment actuallyperforms work. Hours of operation shall be based upon actual equipmentusage as recorded by Engineer. This rate shall represent payment in fullfor Contractor’s direct costs.8. Owned and Other Equipment, When Idle (Standby): Equipment necessaryto be onsite to perform the Work on single shift operations, but notutilized, shall be paid for at the ownership hourly expense rate developedin accordance with the CRG, provided its presence and necessity onsitehas been documented by Engineer. Payment for idle time of portions of anormal workday, in conjunction with original contract Work, will not beallowed. In no event shall idle time claimed in a day for a particular pieceof equipment exceed the normal Work or shift schedule established for theProject. It is agreed that this rate shall represent payment in full forContractor’s direct costs. When Engineer determines that the equipment isnot needed to continuously remain at the Work Site, payment will belimited to actual hours in use.9. Owned and Other Equipment, Multiple Shifts: For multiple shiftoperations, the CRG single shift total hourly costs rate shall apply to theoperating equipment during the first shift. For subsequent shifts, up to 2 ina 24-hour day, operating rate shall be the sum of the total hourly CRGoperating cost and 60 percent of the CRG ownership and overhaulexpense. Payment for idle or standby time for second and third shifts shallbe 20 percent of the CRG ownership and overhaul expense.10. When necessary to obtain owned equipment from sources beyond theProject limits, the actual cost to transfer equipment to the Work Site andreturn it to its original location will be allowed as an additional item ofexpense. Move-in and move-out allowances will not be made forequipment brought to the Project if the equipment is also used on originalContract or related Work.11. If the move-out destination is not to the original location, payment formove-out will not exceed payment for move-in.12. If move is made by common carrier, the allowance will be the amountpaid for the freight. If equipment is hauled with Contractor’s own forces,rental will be allowed for the hauling unit plus the hauling unit operator’swage. If equipment is transferred under its own power, the rental will bePW/WBG/382059CONTRACT MODIFICATIONAUGUST 15, 2012PROCEDURES©COPYRIGHT 2012 CH2M HILL 01 26 00 - 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!