3.07 PREFORMED CONTROL JOINTSA. Use only where specifically shown; do not use in water-holding basins.B. Locate slightly below top of slab.C. Install in accordance with manufacturer’s written instructions in straight, fulllengthpieces.D. Steel Strip Type with Preformed Groove: Brace to withstand pressure ofconcrete during and after placement.END OF SECTIONCONCRETE JOINTSPW/WBG/382059AND ACCESSORIES AUGUST 15, 201203 15 00 - 10 ©COPYRIGHT 2012 CH2M HILL