C. Damaged or incomplete products to be returned for replacement will not beunloaded, except as necessary to expedite return shipment. Owner will submitclaims for transportation damage and expedite replacement of damaged,defective, or deficient items.D. Indicate signed acceptance of delivery on a copy of the invoice.E. If Contractor is not prepared to accept delivery of Owner-furnished productsby either the specified Estimated Date of Arrival or such Owner-confirmeddelivery date, as specified herein, associated costs incurred by Owner shall beborne by Contractor. Such costs may include, but not be limited to,demurrage, interest, insurance costs, additional administrative and engineeringcosts, additional factory and field technical support, additional storage andreshipping costs, cost escalation, and extended warranty costs due.1.06 UNLOADING, STORAGE AND MAINTENANCEA. Subsequent to transfer, Contractor shall have complete responsibility forunloading Owner-furnished products. Unload product in accordance withmanufacturers’ instructions, or as specified.B. Store, protect, and maintain product to prevent damage until final acceptanceof completed work. Damage to or loss of products after date of transfer toContractor shall be repaired to original condition, or replaced with newidentical products, at the discretion of Engineer.C. Maintain complete inventory of all Owner-furnished products after theirtransfer to Contractor.1.07 SCHEDULING AND SEQUENCINGA. Include sequencing constraints specified herein as part of Progress Schedule.B. Owner will keep Contractor informed of probable delivery date changes.C. Owner will confirm delivery date with Contractor 10 days prior to scheduleddelivery, and within 24 hours of expected delivery time.D. Where a preinstallation meeting is required by this Section, provide aminimum of 10 days’ advance written notice to Owner of the proposed datefor starting installation.E. Provide a minimum of 10 days notice to Owner that Owner-furnished productis ready for all special services listed in manufacturer’s contract. Contractorshall bear the cost of all damages assessed to Owner by seller resulting fromdelays caused by Contractor.OWNER-FURNISHED PRODUCTSPW/WBG/38205901 64 00 - 2 AUGUST 15, 2012©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!