11. Where the concealed raceway is uncovered remove raceway (orextended to new location if appropriate).12. Provide new typewritten panelboard circuit directory cards.L. Universal Waste Lamps and Thermostats: Manage, contain, package, andlabel in strict accordance with 40 CFR 273.3.02 PROTECTIONA. Building Occupancy: Refer to Section 01 31 13, Project Coordination, forspecific requirements related to concurrent occupancy of facilities to bepartially demolished.B. Dust and Debris Control:1. Prevent the spread of dust to occupied portions of the building andavoid the creation of a nuisance in the surrounding area. Do not usewater if it results in hazardous or objectionable conditions such as, butnot limited to, ice, flooding, or pollution.2. Sweep slabs and pavements as often as necessary to control the spreadof debris.C. Traffic Control Signs: Where pedestrian and driver safety is endangered in thearea of removal Work, use traffic barricades with flashing lights.D. Existing Work:1. Survey the site and examine the Drawings and Specifications todetermine the extent of the Work before beginning any demolition orrenovation.2. Take necessary precautions to avoid damage to existing items scheduledto remain in place, to be reused, or to remain the property of Owner; anyContractor-damaged items shall be repaired or replaced as directed byEngineer.3. Provide temporary weather protection during interval between removalof existing exterior surfaces and installation of new to ensure that nowater leakage or damage occurs to structure or interior areas of existingbuilding.DEMOLITIONPW/WBG/38205902 41 00 - 6 AUGUST 15, 2012©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!