31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3. Show complete interdependence and sequence of construction andProject-related activities reasonably required to complete the Work.4. Identify the Work of separate stages and other logically groupedactivities, and clearly identify critical path of activities.5. Reflect sequences of the Work, restraints, delivery windows, reviewtimes, Contract Times and Project Milestones set forth in the Agreementand Section 01 31 13, Project Coordination.6. Include as applicable, at a minimum:a. Obtaining permits, submittals for early product procurement, andlong lead time items.b. Mobilization and other preliminary activities.c. Initial Site work.d. Specified Work sequences, constraints, and Milestones, includingSubstantial Completion date(s) Subcontract Work.e. Major equipment design, fabrication, factory testing, and deliverydates.f. Delivery dates for Owner-furnished products, as specified inSection 01 11 00, Summary of Work.g. Sitework.h. Concrete Work.i. Structural steel Work.j. Architectural features Work.k. Conveying systems Work.l. Equipment Work.m. Mechanical Work.n. Electrical Work.o. Instrumentation and control Work.p. Interfaces with Owner-furnished equipment.q. Other important Work for each major facility.r. Equipment and system startup and test activities.s. Project closeout and cleanup.t. Demobilization.7. Activity duration for Submittal review shall not be less than review timespecified unless clearly identified and prior written acceptance has beenobtained from Engineer.C. Network Graphical Display:1. Plot or print on paper not greater than 30 inches by 42 inches or smallerthan 22 inches by 34 inches, unless otherwise approved.2. Title Block: Show name of Project, Owner, date submitted, revision orupdate number, and the name of the scheduler. Updated schedules shallindicate data date.3. Identify horizontally across top of schedule the time frame by year,month, and day.PW/WBG/382059CONSTRUCTION PROGRESSAUGUST 15, 2012DOCUMENTATION©COPYRIGHT 2012 CH2M HILL 01 32 00 - 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!