31.07.2015 Views

Vol 2 - Garney Construction

Vol 2 - Garney Construction

Vol 2 - Garney Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1.02 SUBMITTALSA. Action Submittals:1. Product Data: Indicate component materials and dimensions, andinclude construction and application details for the following:a. Metal framing anchors.b. <strong>Construction</strong> adhesives.B. Informational Submittals:1. ICC Evaluation Service Reports, including the following as a minimum:a. Connections and Fasteners.b. Wood Treatment.c. Nails.d. Wood Framing.2. Wood treatment manufacturer’s instructions for handling, storing,installation, and finishing of treated material.3. Material Certificates: Showing species and grade selected for dimensionlumber for each use.a. Material certificates for dimensional lumber in compliance withallowable unit stresses. Show species and grade selected for eachuse as well as design values approved by the ALSC’s Board ofReview.b. For each type of preservative-treated wood product, includecertification by treatment plant stating type of preservativesolution and pressure process used, net amount of preservativeretained, and compliance with applicable standards.c. For waterborne-treated products include statement that moisturecontent of treated materials was reduced to levels indicated priorto shipment to Site.4. Material test reports from testing laboratory showing and interpretingtest results in accordance with test methods UL 723, NFPA 255, andASTM E84, relative to fire-retardant treated wood products.1.03 DELIVERY, STORAGE, AND HANDLINGA. Upon delivery to Site, immediately place materials in area protected fromweather. Do not store seasoned materials in wet or damp areas.B. Protect sheet materials from breaking corners and damaging surfaces whileunloading.C. Store materials a minimum of 6 inches above ground on framework orblocking and cover with waterproof covering, providing for adequate aircirculation and ventilation. Store sheet materials flat, not on edge.ROUGH CARPENTRYPW/WBG/38205906 10 00 - 2 AUGUST 15, 2012©COPYRIGHT 2012 CH2M HILL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!